FHWA NBI 2024 Inspection record Public-domain dataset

SANTIAGO CNYN ROAD

Carrying SANTIAGO CNYN ROAD over SANTIAGO CREEK

0.2 MI W/O SILVERADO CYN, Orange, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
31 t Inventory load rating

Bridge Snapshot: SANTIAGO CNYN ROAD

The SANTIAGO CNYN ROAD bridge in Orange, California carries SANTIAGO CNYN ROAD over SANTIAGO CREEK. It was built in 1963, making it 63 years old today. The structure is built primarily of concrete continuous and spans 4 sections, stretching 69.5 meters (228 feet) end to end. Daily traffic averages 7,000 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 30.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SANTIAGO CNYN ROAD compares

▼ 0.8
Load rating vs California average (31.3 t)
Bottom 38%
Lower load rating than 62% of California bridges
1,224
Bridges in Orange · 27 in Poor condition
SANTIAGO CNYN ROAD 30.5 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
60.2 / 100 - historical 50–79.9 band
Structural adequacy /55
44.1
Serviceability /30
12.0
Essentiality /15
4.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
30.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1963
Material
Concrete Continuous
Number of Spans
4
Structure Length
69.5 m (228 ft)
Deck Width
9.3 m (31 ft)
Owner
County Highway Agency
Avg Daily Traffic
7,000 vehicles/day
Structure Number
55C0038

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether SANTIAGO CNYN ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SANTIAGO CNYN ROAD against other structures in Orange and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SANTIAGO CNYN ROAD?

SANTIAGO CNYN ROAD in Orange, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SANTIAGO CNYN ROAD inspected?

SANTIAGO CNYN ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SANTIAGO CNYN ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SANTIAGO CNYN ROAD?

SANTIAGO CNYN ROAD has an NBI inventory load rating of 30.5 metric tons.

Who is responsible for maintaining SANTIAGO CNYN ROAD?

SANTIAGO CNYN ROAD is owned and maintained by County Highway Agency.

How old is SANTIAGO CNYN ROAD and does age affect safety?

SANTIAGO CNYN ROAD was built in 1963, making it 63 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.