FHWA NBI 2024 Inspection record Public-domain dataset

Crestway M0019

Carrying Crestway M0019 over Razor Run

2.76 MILES WEST OF SR49, Montgomery, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
54 t Inventory load rating

Bridge Snapshot: Crestway M0019

The Crestway M0019 bridge in Montgomery, Ohio carries Crestway M0019 over Razor Run. It was built in 2002, making it 24 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 18.9 meters (62 feet) end to end. Daily traffic averages 624 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 53.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Crestway M0019 compares

▲ 16.0
Load rating vs Ohio average (37.5 t)
Top 11%
Higher load rating than 89% of Ohio bridges
632
Bridges in Montgomery · 16 in Poor condition
Crestway M0019 53.5 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
99.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
53.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2002
Material
Prestressed Concrete
Number of Spans
1
Structure Length
18.9 m (62 ft)
Deck Width
9.8 m (32 ft)
Owner
County Highway Agency
Avg Daily Traffic
624 vehicles/day
Structure Number
5769248

Condition Analysis

  • The deck (driving surface) is in good condition (9/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 9/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 9/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether Crestway M0019 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Crestway M0019 against other structures in Montgomery and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Crestway M0019?

Crestway M0019 in Montgomery, Ohio has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is Crestway M0019 inspected?

Crestway M0019's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 624 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Crestway M0019 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Crestway M0019?

Crestway M0019 has an NBI inventory load rating of 53.5 metric tons.

Who is responsible for maintaining Crestway M0019?

Crestway M0019 is owned and maintained by County Highway Agency.

How old is Crestway M0019 and does age affect safety?

Crestway M0019 was built in 2002, making it 24 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.