FHWA NBI 2024 Inspection record Public-domain dataset

MIDWAY DR

Carrying MIDWAY DR over ESCONDIDO CREEK

0.2 MI N/O VALLEY PKWY, San Diego, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: MIDWAY DR

The MIDWAY DR bridge in San Diego, California carries MIDWAY DR over ESCONDIDO CREEK. It was built in 1970, making it 56 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 21.0 meters (69 feet) end to end. Daily traffic averages 20,900 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MIDWAY DR compares

▲ 1.1
Load rating vs California average (31.3 t)
Bottom 41%
Lower load rating than 59% of California bridges
1,707
Bridges in San Diego · 27 in Poor condition
MIDWAY DR 32.4 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
91.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
24.0
Essentiality /15
12.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Material
Prestressed Concrete
Number of Spans
1
Structure Length
21.0 m (69 ft)
Deck Width
19.5 m (64 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
20,900 vehicles/day
Structure Number
57C0455

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether MIDWAY DR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare MIDWAY DR against other structures in San Diego and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MIDWAY DR?

MIDWAY DR in San Diego, California has a deck rating of 5/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is MIDWAY DR inspected?

MIDWAY DR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20,900 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MIDWAY DR is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MIDWAY DR?

MIDWAY DR has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining MIDWAY DR?

MIDWAY DR is owned and maintained by City/Municipal Highway Agency.

How old is MIDWAY DR and does age affect safety?

MIDWAY DR was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.