FHWA NBI 2024 Inspection record Public-domain dataset

LAWRENCE WELK DR

Carrying LAWRENCE WELK DR over SOUTH FORK MOOSA CREEK

250 FT E/O CHAMPAGNE BLVD, San Diego, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
24 t Inventory load rating

Bridge Snapshot: LAWRENCE WELK DR

The LAWRENCE WELK DR bridge in San Diego, California carries LAWRENCE WELK DR over SOUTH FORK MOOSA CREEK. It was built in 1966, making it 60 years old today. It was last reconstructed in 1978, extending its service life. The structure is built primarily of concrete and spans 9 sections, stretching 29.6 meters (97 feet) end to end. Daily traffic averages 2,625 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show culvert at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 24.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LAWRENCE WELK DR compares

▼ 7.0
Load rating vs California average (31.3 t)
Bottom 19%
Lower load rating than 81% of California bridges
1,707
Bridges in San Diego · 27 in Poor condition
LAWRENCE WELK DR 24.3 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
92.1 / 100 - historical 80–100 band
Structural adequacy /55
47.5
Serviceability /30
30.0
Essentiality /15
14.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Culvert
6/9
Fair (5–6)
Inventory Load Rating
24.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1966
Last Reconstructed
1978
Material
Concrete
Number of Spans
9
Structure Length
29.6 m (97 ft)
Deck Width
25.6 m (84 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,625 vehicles/day
Structure Number
57C0511

How to read this record

This page shows what the last federal inspection recorded, not whether LAWRENCE WELK DR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LAWRENCE WELK DR against other structures in San Diego and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LAWRENCE WELK DR?

LAWRENCE WELK DR in San Diego, California on the FHWA's 0–9 scale.

How often is LAWRENCE WELK DR inspected?

LAWRENCE WELK DR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,625 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LAWRENCE WELK DR is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LAWRENCE WELK DR?

LAWRENCE WELK DR has an NBI inventory load rating of 24.3 metric tons.

Who is responsible for maintaining LAWRENCE WELK DR?

LAWRENCE WELK DR is owned and maintained by County Highway Agency.

How old is LAWRENCE WELK DR and does age affect safety?

LAWRENCE WELK DR was built in 1966, making it 60 years old and last reconstructed in 1978.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.