FHWA NBI 2024 Inspection record Public-domain dataset

CR 350 WEST

Carrying CR 350 WEST over YOUNGS CREEK

0.10 S OF CR 725 S, Orange, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
5 t Inventory load rating

Bridge Snapshot: CR 350 WEST

The CR 350 WEST bridge in Orange, Indiana carries CR 350 WEST over YOUNGS CREEK. It was built in 1935, making it 91 years old today. The structure is built primarily of steel and spans 1 section, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 90 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 4.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 350 WEST compares

▼ 30.7
Load rating vs Indiana average (35.6 t)
Bottom 1%
Lower load rating than 99% of Indiana bridges
133
Bridges in Orange · 14 in Poor condition
CR 350 WEST 4.9 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
34.8 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
20.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
4.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1935
Material
Steel
Number of Spans
1
Structure Length
12.2 m (40 ft)
Deck Width
6.2 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
90 vehicles/day
Structure Number
5900063

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

CR 350 WEST is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CR 350 WEST against other structures in Orange and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 350 WEST?

CR 350 WEST in Orange, Indiana has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is CR 350 WEST inspected?

CR 350 WEST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 90 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 350 WEST is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 350 WEST?

CR 350 WEST has an NBI inventory load rating of 4.9 metric tons.

Who is responsible for maintaining CR 350 WEST?

CR 350 WEST is owned and maintained by County Highway Agency.

How old is CR 350 WEST and does age affect safety?

CR 350 WEST was built in 1935, making it 91 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.