FHWA NBI 2024 Inspection record Public-domain dataset

Clearwater Dr

Carrying Clearwater Dr over MILLERS CANAL

0.55 MI S OF I12 ON LA 16, Livingston, Louisiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
19 t Inventory load rating

Bridge Snapshot: Clearwater Dr

The Clearwater Dr bridge in Livingston, Louisiana carries Clearwater Dr over MILLERS CANAL. It was built in 1978, making it 48 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 11.6 meters (38 feet) end to end. Daily traffic averages 500 vehicles, placing it in the lower-traffic tier of Louisiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 18.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Clearwater Dr compares

▼ 13.5
Load rating vs Louisiana average (32.3 t)
Bottom 14%
Lower load rating than 86% of Louisiana bridges
253
Bridges in Livingston · 24 in Poor condition
Clearwater Dr 18.8 t
Louisiana average 32.3 t

Live comparison across Louisiana.

Historical Sufficiency Rating

PlainBridge-computed
31.5 / 100 - historical 20–49.9 band
Structural adequacy /55
13.7
Serviceability /30
14.2
Essentiality /15
3.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
18.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1978
Material
Concrete
Number of Spans
2
Structure Length
11.6 m (38 ft)
Deck Width
8.3 m (27 ft)
Owner
County Highway Agency
Avg Daily Traffic
500 vehicles/day
Structure Number
623230272905651

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

Clearwater Dr is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Clearwater Dr against other structures in Livingston and across Louisiana. Louisiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Clearwater Dr?

Clearwater Dr in Livingston, Louisiana has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is Clearwater Dr inspected?

Clearwater Dr's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Clearwater Dr is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Clearwater Dr?

Clearwater Dr has an NBI inventory load rating of 18.8 metric tons.

Who is responsible for maintaining Clearwater Dr?

Clearwater Dr is owned and maintained by County Highway Agency.

How old is Clearwater Dr and does age affect safety?

Clearwater Dr was built in 1978, making it 48 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.