FHWA NBI 2024 Inspection record Public-domain dataset

I 35E

Carrying I 35E over MISSISSIPPI ; UP RR

0.9 MI S OF JCT TH 5, Ramsey, Minnesota

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
35 t Inventory load rating

Bridge Snapshot: I 35E

The I 35E bridge in Ramsey, Minnesota carries I 35E over MISSISSIPPI ; UP RR. It was built in 2001, making it 25 years old today. The structure is built primarily of steel continuous and spans 6 sections, stretching 428.6 meters (1406 feet) end to end. Daily traffic averages 96,000 vehicles, placing it in the heavily-trafficked tier of Minnesota bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 34.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I 35E compares

▼ 1.2
Load rating vs Minnesota average (35.7 t)
Bottom 38%
Lower load rating than 62% of Minnesota bridges
318
Bridges in Ramsey · 8 in Poor condition
I 35E 34.5 t
Minnesota average 35.7 t

Live comparison across Minnesota.

Historical Sufficiency Rating

PlainBridge-computed
85.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
0.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
34.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2001
Material
Steel Continuous
Number of Spans
6
Structure Length
428.6 m (1406 ft)
Deck Width
41.8 m (137 ft)
Owner
State Highway Agency
Avg Daily Traffic
96,000 vehicles/day
Structure Number
62912

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether I 35E is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I 35E against other structures in Ramsey and across Minnesota. Minnesota bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I 35E?

I 35E in Ramsey, Minnesota has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I 35E inspected?

I 35E's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 96,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I 35E is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I 35E?

I 35E has an NBI inventory load rating of 34.5 metric tons.

Who is responsible for maintaining I 35E?

I 35E is owned and maintained by State Highway Agency.

How old is I 35E and does age affect safety?

I 35E was built in 2001, making it 25 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.