FHWA NBI 2024 Inspection record Public-domain dataset

BOYD ROAD

Carrying BOYD ROAD over OPOSSUM RUN

0.2MI WEST OF LONDON ROAD, Pickaway, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
44 t Inventory load rating

Bridge Snapshot: BOYD ROAD

The BOYD ROAD bridge in Pickaway, Ohio carries BOYD ROAD over OPOSSUM RUN. It was built in 1988, making it 38 years old today. It was last reconstructed in 2023, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 11.9 meters (39 feet) end to end. Daily traffic averages 324 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 43.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BOYD ROAD compares

▲ 6.2
Load rating vs Ohio average (37.5 t)
Top 25%
Higher load rating than 75% of Ohio bridges
224
Bridges in Pickaway · 5 in Poor condition
BOYD ROAD 43.7 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
81.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
14.9
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
43.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Last Reconstructed
2023
Material
Prestressed Concrete
Number of Spans
1
Structure Length
11.9 m (39 ft)
Deck Width
6.4 m (21 ft)
Owner
County Highway Agency
Avg Daily Traffic
324 vehicles/day
Structure Number
6531393

Condition Analysis

  • The deck (driving surface) is in good condition (9/9), showing no significant deterioration.
  • At 9/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether BOYD ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BOYD ROAD against other structures in Pickaway and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BOYD ROAD?

BOYD ROAD in Pickaway, Ohio has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BOYD ROAD inspected?

BOYD ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 324 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BOYD ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BOYD ROAD?

BOYD ROAD has an NBI inventory load rating of 43.7 metric tons.

Who is responsible for maintaining BOYD ROAD?

BOYD ROAD is owned and maintained by County Highway Agency.

How old is BOYD ROAD and does age affect safety?

BOYD ROAD was built in 1988, making it 38 years old and last reconstructed in 2023.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.