FHWA NBI 2024 Inspection record Public-domain dataset

LOCKBOURNE EASTERN

Carrying LOCKBOURNE EASTERN over CSX; N & S RAILROADS

0.5 MI E. OF CROMLEY ROAD, Pickaway, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
30 t Inventory load rating

Bridge Snapshot: LOCKBOURNE EASTERN

The LOCKBOURNE EASTERN bridge in Pickaway, Ohio carries LOCKBOURNE EASTERN over CSX; N & S RAILROADS. It was built in 2018, making it 8 years old today. The structure is built primarily of prestressed concrete continuous and spans 5 sections, stretching 99.7 meters (327 feet) end to end. Daily traffic averages 558 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 29.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LOCKBOURNE EASTERN compares

▼ 8.0
Load rating vs Ohio average (37.5 t)
Bottom 23%
Lower load rating than 77% of Ohio bridges
224
Bridges in Pickaway · 5 in Poor condition
LOCKBOURNE EASTERN 29.5 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
96.2 / 100 - historical 80–100 band
Structural adequacy /55
53.4
Serviceability /30
28.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
29.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2018
Material
Prestressed Concrete Continuous
Number of Spans
5
Structure Length
99.7 m (327 ft)
Deck Width
11.0 m (36 ft)
Owner
County Highway Agency
Avg Daily Traffic
558 vehicles/day
Structure Number
6540113

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (9/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 9/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether LOCKBOURNE EASTERN is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LOCKBOURNE EASTERN against other structures in Pickaway and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LOCKBOURNE EASTERN?

LOCKBOURNE EASTERN in Pickaway, Ohio has a deck rating of 8/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is LOCKBOURNE EASTERN inspected?

LOCKBOURNE EASTERN's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 558 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LOCKBOURNE EASTERN is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LOCKBOURNE EASTERN?

LOCKBOURNE EASTERN has an NBI inventory load rating of 29.5 metric tons.

Who is responsible for maintaining LOCKBOURNE EASTERN?

LOCKBOURNE EASTERN is owned and maintained by County Highway Agency.

How old is LOCKBOURNE EASTERN and does age affect safety?

LOCKBOURNE EASTERN was built in 2018, making it 8 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.