FHWA NBI 2024 Inspection record Public-domain dataset

PIONEER TRAIL

Carrying PIONEER TRAIL over CUYAHOGA RIVER

0.6 MI. EAST OF SR 44, Portage, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: PIONEER TRAIL

The PIONEER TRAIL bridge in Portage, Ohio carries PIONEER TRAIL over CUYAHOGA RIVER. It was built in 1991, making it 35 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 36.3 meters (119 feet) end to end. Daily traffic averages 895 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PIONEER TRAIL compares

▼ 4.8
Load rating vs Ohio average (37.5 t)
Bottom 47%
Lower load rating than 53% of Ohio bridges
217
Bridges in Portage · 20 in Poor condition
PIONEER TRAIL 32.7 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
79.9 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Material
Prestressed Concrete
Number of Spans
3
Structure Length
36.3 m (119 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
895 vehicles/day
Structure Number
6733662

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether PIONEER TRAIL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PIONEER TRAIL against other structures in Portage and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PIONEER TRAIL?

PIONEER TRAIL in Portage, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is PIONEER TRAIL inspected?

PIONEER TRAIL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 895 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PIONEER TRAIL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PIONEER TRAIL?

PIONEER TRAIL has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining PIONEER TRAIL?

PIONEER TRAIL is owned and maintained by County Highway Agency.

How old is PIONEER TRAIL and does age affect safety?

PIONEER TRAIL was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.