SUNRISE BOULIVARD
Carrying SUNRISE BOULIVARD over FISH CREEK
0.25 MI N.OF SR59, Portage, Ohio
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: SUNRISE BOULIVARD
The SUNRISE BOULIVARD bridge in Portage, Ohio carries SUNRISE BOULIVARD over FISH CREEK. It was built in 1968, making it 58 years old today. It was last reconstructed in 1988, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 13.1 meters (43 feet) end to end. Daily traffic averages 150 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 3/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 25.9 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How SUNRISE BOULIVARD compares
Live comparison across Ohio.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1968
- Last Reconstructed
- 1988
- Material
- Steel
- Number of Spans
- 1
- Structure Length
- 13.1 m (43 ft)
- Deck Width
- 10.5 m (34 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 150 vehicles/day
- Structure Number
- 6760015
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • At 3/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
- • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
- • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
How to read this record
SUNRISE BOULIVARD is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare SUNRISE BOULIVARD against other structures in Portage and across Ohio. Ohio bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for SUNRISE BOULIVARD?
SUNRISE BOULIVARD in Portage, Ohio has a deck rating of 3/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.
How often is SUNRISE BOULIVARD inspected?
SUNRISE BOULIVARD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 150 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. SUNRISE BOULIVARD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for SUNRISE BOULIVARD?
SUNRISE BOULIVARD has an NBI inventory load rating of 25.9 metric tons.
Who is responsible for maintaining SUNRISE BOULIVARD?
SUNRISE BOULIVARD is owned and maintained by City/Municipal Highway Agency.
How old is SUNRISE BOULIVARD and does age affect safety?
SUNRISE BOULIVARD was built in 1968, making it 58 years old and last reconstructed in 1988.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.