FHWA NBI 2024 Inspection record Public-domain dataset

SR503

Carrying SR503 over PRICE CREEK

2.2 MI N OF W ALEXANDRIA, Preble, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating

Bridge Snapshot: SR503

The SR503 bridge in Preble, Ohio carries SR503 over PRICE CREEK. It was built in 1958, making it 68 years old today. It was last reconstructed in 2016, extending its service life. The structure is built primarily of concrete continuous and spans 3 sections, stretching 38.1 meters (125 feet) end to end. Daily traffic averages 3,800 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 42.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR503 compares

▲ 5.3
Load rating vs Ohio average (37.5 t)
Top 26%
Higher load rating than 74% of Ohio bridges
357
Bridges in Preble · 39 in Poor condition
SR503 42.8 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
94.3 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
9.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
42.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1958
Last Reconstructed
2016
Material
Concrete Continuous
Number of Spans
3
Structure Length
38.1 m (125 ft)
Deck Width
12.2 m (40 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,800 vehicles/day
Structure Number
6803814

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether SR503 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR503 against other structures in Preble and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR503?

SR503 in Preble, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is SR503 inspected?

SR503's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR503 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR503?

SR503 has an NBI inventory load rating of 42.8 metric tons.

Who is responsible for maintaining SR503?

SR503 is owned and maintained by State Highway Agency.

How old is SR503 and does age affect safety?

SR503 was built in 1958, making it 68 years old and last reconstructed in 2016.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.