FHWA NBI 2024 Inspection record Public-domain dataset

LEXINGTON SALEM

Carrying LEXINGTON SALEM over LESLEY RUN

500' EAST OF COUNTY LINE, Preble, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
94 t Inventory load rating

Bridge Snapshot: LEXINGTON SALEM

The LEXINGTON SALEM bridge in Preble, Ohio carries LEXINGTON SALEM over LESLEY RUN. It was built in 1997, making it 29 years old today. It was last reconstructed in 2016, extending its service life. The structure is built primarily of concrete and spans 1 section, stretching 7.6 meters (25 feet) end to end. Daily traffic averages 1,380 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 94.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LEXINGTON SALEM compares

▲ 56.5
Load rating vs Ohio average (37.5 t)
Top 1%
Higher load rating than 99% of Ohio bridges
357
Bridges in Preble · 39 in Poor condition
LEXINGTON SALEM 94.0 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
90.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
20.9
Essentiality /15
14.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
94.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1997
Last Reconstructed
2016
Material
Concrete
Number of Spans
1
Structure Length
7.6 m (25 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,380 vehicles/day
Structure Number
6830447

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether LEXINGTON SALEM is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LEXINGTON SALEM against other structures in Preble and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LEXINGTON SALEM?

LEXINGTON SALEM in Preble, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is LEXINGTON SALEM inspected?

LEXINGTON SALEM's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,380 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LEXINGTON SALEM is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LEXINGTON SALEM?

LEXINGTON SALEM has an NBI inventory load rating of 94.0 metric tons.

Who is responsible for maintaining LEXINGTON SALEM?

LEXINGTON SALEM is owned and maintained by County Highway Agency.

How old is LEXINGTON SALEM and does age affect safety?

LEXINGTON SALEM was built in 1997, making it 29 years old and last reconstructed in 2016.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.