FHWA NBI 2024 Inspection record Public-domain dataset

Apollo Boulevard

Carrying Apollo Boulevard over Eau Gallie River

Apollo Blvd - Eau Gallie, Brevard, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating

Bridge Snapshot: Apollo Boulevard

The Apollo Boulevard bridge in Brevard, Florida carries Apollo Boulevard over Eau Gallie River. It was built in 2015, making it 11 years old today. The structure is built primarily of prestressed concrete and spans 12 sections, stretching 198.1 meters (650 feet) end to end. Daily traffic averages 22,000 vehicles, placing it in the heavily-trafficked tier of Florida bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 42.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Apollo Boulevard compares

▲ 4.0
Load rating vs Florida average (38.9 t)
Top 29%
Higher load rating than 71% of Florida bridges
249
Bridges in Brevard · 1 in Poor condition
Apollo Boulevard 42.9 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
96.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
11.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
42.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2015
Material
Prestressed Concrete
Number of Spans
12
Structure Length
198.1 m (650 ft)
Deck Width
26.5 m (87 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
22,000 vehicles/day
Structure Number
705604

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether Apollo Boulevard is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Apollo Boulevard against other structures in Brevard and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Apollo Boulevard?

Apollo Boulevard in Brevard, Florida has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is Apollo Boulevard inspected?

Apollo Boulevard's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 22,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Apollo Boulevard is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Apollo Boulevard?

Apollo Boulevard has an NBI inventory load rating of 42.9 metric tons.

Who is responsible for maintaining Apollo Boulevard?

Apollo Boulevard is owned and maintained by City/Municipal Highway Agency.

How old is Apollo Boulevard and does age affect safety?

Apollo Boulevard was built in 2015, making it 11 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.