FHWA NBI 2024 Inspection record Public-domain dataset

U.S. ROUTE 35

Carrying U.S. ROUTE 35 over U.S. ROUTE 35 E-BOUND

1.5 MI W OF MUSGROVE RD, Ross, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: U.S. ROUTE 35

The U.S. ROUTE 35 bridge in Ross, Ohio carries U.S. ROUTE 35 over U.S. ROUTE 35 E-BOUND. It was built in 2003, making it 23 years old today. The structure is built primarily of concrete. Daily traffic averages 741 vehicles, placing it in the lower-traffic tier of Ohio bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. None of this bridge's reported major components fall into the Poor condition range.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How U.S. ROUTE 35 compares

356
Bridges in Ross · 28 in Poor condition

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
97.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.0
Essentiality /15
14.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2003
Material
Concrete
Avg Daily Traffic
741 vehicles/day
Structure Number
7102453

How to read this record

This page shows what the last federal inspection recorded, not whether U.S. ROUTE 35 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare U.S. ROUTE 35 against other structures in Ross and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for U.S. ROUTE 35?

U.S. ROUTE 35 in Ross, Ohio on the FHWA's 0–9 scale.

How often is U.S. ROUTE 35 inspected?

U.S. ROUTE 35's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 741 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. U.S. ROUTE 35 is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for U.S. ROUTE 35?

An inventory load rating is not recorded for U.S. ROUTE 35.

Who is responsible for maintaining U.S. ROUTE 35?

Ownership is not specified for U.S. ROUTE 35 in the NBI.

How old is U.S. ROUTE 35 and does age affect safety?

U.S. ROUTE 35 was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.