FHWA NBI 2024 Inspection record Public-domain dataset

EDE TR 17

Carrying EDE TR 17 over BUCKEYE CREEK

.08 MI N OF SR 67, Seneca, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating

Bridge Snapshot: EDE TR 17

The EDE TR 17 bridge in Seneca, Ohio carries EDE TR 17 over BUCKEYE CREEK. It was built in 1959, making it 67 years old today. It was last reconstructed in 2000, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 16.2 meters (53 feet) end to end. Daily traffic averages 222 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 43.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How EDE TR 17 compares

▲ 5.6
Load rating vs Ohio average (37.5 t)
Top 26%
Higher load rating than 74% of Ohio bridges
275
Bridges in Seneca · 4 in Poor condition
EDE TR 17 43.1 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
90.7 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
23.8
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
43.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1959
Last Reconstructed
2000
Material
Prestressed Concrete
Number of Spans
1
Structure Length
16.2 m (53 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
222 vehicles/day
Structure Number
7436319

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether EDE TR 17 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare EDE TR 17 against other structures in Seneca and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for EDE TR 17?

EDE TR 17 in Seneca, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is EDE TR 17 inspected?

EDE TR 17's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 222 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. EDE TR 17 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for EDE TR 17?

EDE TR 17 has an NBI inventory load rating of 43.1 metric tons.

Who is responsible for maintaining EDE TR 17?

EDE TR 17 is owned and maintained by County Highway Agency.

How old is EDE TR 17 and does age affect safety?

EDE TR 17 was built in 1959, making it 67 years old and last reconstructed in 2000.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.