FHWA NBI 2024 Inspection record Public-domain dataset

PLE CR 42

Carrying PLE CR 42 over EAST BRANCH OF WOLF CREE

0.43 MILES WEST OF SR 53, Seneca, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
56 t Inventory load rating

Bridge Snapshot: PLE CR 42

The PLE CR 42 bridge in Seneca, Ohio carries PLE CR 42 over EAST BRANCH OF WOLF CREE. It was built in 2010, making it 16 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 36.9 meters (121 feet) end to end. Daily traffic averages 666 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 56.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PLE CR 42 compares

▲ 18.9
Load rating vs Ohio average (37.5 t)
Top 9%
Higher load rating than 91% of Ohio bridges
275
Bridges in Seneca · 4 in Poor condition
PLE CR 42 56.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
99.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
56.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2010
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
36.9 m (121 ft)
Deck Width
11.0 m (36 ft)
Owner
County Highway Agency
Avg Daily Traffic
666 vehicles/day
Structure Number
7443692

Condition Analysis

  • The deck (driving surface) is in good condition (9/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (9/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 9/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PLE CR 42 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PLE CR 42 against other structures in Seneca and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PLE CR 42?

PLE CR 42 in Seneca, Ohio has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is PLE CR 42 inspected?

PLE CR 42's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 666 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PLE CR 42 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PLE CR 42?

PLE CR 42 has an NBI inventory load rating of 56.4 metric tons.

Who is responsible for maintaining PLE CR 42?

PLE CR 42 is owned and maintained by County Highway Agency.

How old is PLE CR 42 and does age affect safety?

PLE CR 42 was built in 2010, making it 16 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.