SPRUCE AVENUE

Carrying SPRUCE AVENUE over CSX RAILROAD

N of GREENACRE, Shelby, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: SPRUCE AVENUE

The SPRUCE AVENUE bridge in Shelby, Ohio carries SPRUCE AVENUE over CSX RAILROAD. It was built in 1924, making it 102 years old today. The structure is built primarily of concrete and spans 5 sections, stretching 37.2 meters (122 feet) end to end. Daily traffic averages 1,000 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 28.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SPRUCE AVENUE compares

▼ 8.7
Load rating vs Ohio average (37.5 t)
Bottom 19%
Lower load rating than 81% of Ohio bridges
277
Bridges in Shelby · 7 in Poor condition
SPRUCE AVENUE 28.8 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
48.5 / 100 - historical 20–49.9 band
Structural adequacy /55
27.8
Serviceability /30
6.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
28.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1924
Material
Concrete
Number of Spans
5
Structure Length
37.2 m (122 ft)
Deck Width
10.7 m (35 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,000 vehicles/day
Structure Number
7561156

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

SPRUCE AVENUE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SPRUCE AVENUE against other structures in Shelby and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SPRUCE AVENUE?

SPRUCE AVENUE in Shelby, Ohio has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SPRUCE AVENUE inspected?

SPRUCE AVENUE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SPRUCE AVENUE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SPRUCE AVENUE?

SPRUCE AVENUE has an NBI inventory load rating of 28.8 metric tons.

Who is responsible for maintaining SPRUCE AVENUE?

SPRUCE AVENUE is owned and maintained by City/Municipal Highway Agency.

How old is SPRUCE AVENUE and does age affect safety?

SPRUCE AVENUE was built in 1924, making it 102 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.