MA2401 REEDER
Carrying MA2401 REEDER over LITTLE BEECH CREEK
0.2 MI. S. OF TR29, Stark, Ohio
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: MA2401 REEDER
The MA2401 REEDER bridge in Stark, Ohio carries MA2401 REEDER over LITTLE BEECH CREEK. It was built in 1928, making it 98 years old today. It was last reconstructed in 1993, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 8.1 meters (27 feet) end to end. Daily traffic averages 418 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 58.3 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How MA2401 REEDER compares
Live comparison across Ohio.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1928
- Last Reconstructed
- 1993
- Material
- Prestressed Concrete
- Number of Spans
- 1
- Structure Length
- 8.1 m (27 ft)
- Deck Width
- 8.5 m (28 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 418 vehicles/day
- Structure Number
- 7633505
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
- • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
- • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.
How to read this record
This page shows what the last federal inspection recorded, not whether MA2401 REEDER is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare MA2401 REEDER against other structures in Stark and across Ohio. Ohio bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for MA2401 REEDER?
MA2401 REEDER in Stark, Ohio has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.
How often is MA2401 REEDER inspected?
MA2401 REEDER's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 418 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. MA2401 REEDER is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for MA2401 REEDER?
MA2401 REEDER has an NBI inventory load rating of 58.3 metric tons.
Who is responsible for maintaining MA2401 REEDER?
MA2401 REEDER is owned and maintained by County Highway Agency.
How old is MA2401 REEDER and does age affect safety?
MA2401 REEDER was built in 1928, making it 98 years old and last reconstructed in 1993.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.