FHWA NBI 2024 Inspection record Public-domain dataset

MA0626 PINEDALE

Carrying MA0626 PINEDALE over STARK PORTAGE DITCH

0.5 MI. E. OF CR39, Stark, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
32 t Inventory load rating

Bridge Snapshot: MA0626 PINEDALE

The MA0626 PINEDALE bridge in Stark, Ohio carries MA0626 PINEDALE over STARK PORTAGE DITCH. It was built in 1938, making it 88 years old today. The structure is built primarily of steel and spans 1 section, stretching 11.0 meters (36 feet) end to end. Daily traffic averages 324 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MA0626 PINEDALE compares

▼ 5.1
Load rating vs Ohio average (37.5 t)
Bottom 26%
Lower load rating than 74% of Ohio bridges
415
Bridges in Stark · 23 in Poor condition
MA0626 PINEDALE 32.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
67.9 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
10.0
Essentiality /15
14.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1938
Material
Steel
Number of Spans
1
Structure Length
11.0 m (36 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
324 vehicles/day
Structure Number
7633599

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

MA0626 PINEDALE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MA0626 PINEDALE against other structures in Stark and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MA0626 PINEDALE?

MA0626 PINEDALE in Stark, Ohio has a deck rating of 4/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is MA0626 PINEDALE inspected?

MA0626 PINEDALE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 324 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MA0626 PINEDALE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MA0626 PINEDALE?

MA0626 PINEDALE has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining MA0626 PINEDALE?

MA0626 PINEDALE is owned and maintained by County Highway Agency.

How old is MA0626 PINEDALE and does age affect safety?

MA0626 PINEDALE was built in 1938, making it 88 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.