FHWA NBI 2024 Inspection record Public-domain dataset

PL1101 WERNER CHUR

Carrying PL1101 WERNER CHUR over MIDD BRANCH NIMISHILLEN

0.1 MI. EAST OF CR192, Stark, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
39 t Inventory load rating

Bridge Snapshot: PL1101 WERNER CHUR

The PL1101 WERNER CHUR bridge in Stark, Ohio carries PL1101 WERNER CHUR over MIDD BRANCH NIMISHILLEN. It was built in 2016, making it 10 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 66.9 meters (219 feet) end to end. Daily traffic averages 6,670 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 38.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PL1101 WERNER CHUR compares

▲ 1.4
Load rating vs Ohio average (37.5 t)
Top 40%
Higher load rating than 60% of Ohio bridges
415
Bridges in Stark · 23 in Poor condition
PL1101 WERNER CHUR 38.9 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
95.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.0
Essentiality /15
12.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
38.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2016
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
66.9 m (219 ft)
Deck Width
12.3 m (40 ft)
Owner
County Highway Agency
Avg Daily Traffic
6,670 vehicles/day
Structure Number
7636156

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether PL1101 WERNER CHUR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PL1101 WERNER CHUR against other structures in Stark and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PL1101 WERNER CHUR?

PL1101 WERNER CHUR in Stark, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is PL1101 WERNER CHUR inspected?

PL1101 WERNER CHUR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,670 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PL1101 WERNER CHUR is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PL1101 WERNER CHUR?

PL1101 WERNER CHUR has an NBI inventory load rating of 38.9 metric tons.

Who is responsible for maintaining PL1101 WERNER CHUR?

PL1101 WERNER CHUR is owned and maintained by County Highway Agency.

How old is PL1101 WERNER CHUR and does age affect safety?

PL1101 WERNER CHUR was built in 2016, making it 10 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.