FHWA NBI 2024 Inspection record Public-domain dataset

SOUTHPOINTE CIR NE

Carrying SOUTHPOINTE CIR NE over FIRESTONE CREEK

EAST OF PLAIN CENTER RD, Stark, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
35 t Inventory load rating

Bridge Snapshot: SOUTHPOINTE CIR NE

The SOUTHPOINTE CIR NE bridge in Stark, Ohio carries SOUTHPOINTE CIR NE over FIRESTONE CREEK. It was built in 1997, making it 29 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 13.4 meters (44 feet) end to end. Daily traffic averages 300 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 34.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SOUTHPOINTE CIR NE compares

▼ 2.8
Load rating vs Ohio average (37.5 t)
Top 49%
Higher load rating than 51% of Ohio bridges
415
Bridges in Stark · 23 in Poor condition
SOUTHPOINTE CIR NE 34.7 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
92.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
12.8
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
34.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1997
Material
Concrete
Number of Spans
2
Structure Length
13.4 m (44 ft)
Deck Width
13.7 m (45 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
300 vehicles/day
Structure Number
7662262

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SOUTHPOINTE CIR NE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SOUTHPOINTE CIR NE against other structures in Stark and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SOUTHPOINTE CIR NE?

SOUTHPOINTE CIR NE in Stark, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is SOUTHPOINTE CIR NE inspected?

SOUTHPOINTE CIR NE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SOUTHPOINTE CIR NE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SOUTHPOINTE CIR NE?

SOUTHPOINTE CIR NE has an NBI inventory load rating of 34.7 metric tons.

Who is responsible for maintaining SOUTHPOINTE CIR NE?

SOUTHPOINTE CIR NE is owned and maintained by City/Municipal Highway Agency.

How old is SOUTHPOINTE CIR NE and does age affect safety?

SOUTHPOINTE CIR NE was built in 1997, making it 29 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.