FHWA NBI 2024 Inspection record Public-domain dataset

AKRON-PENINSULA RD

Carrying AKRON-PENINSULA RD over SALT RUN

400 FT S OF TRUXELL RD, Summit, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
22 t Inventory load rating

Bridge Snapshot: AKRON-PENINSULA RD

The AKRON-PENINSULA RD bridge in Summit, Ohio carries AKRON-PENINSULA RD over SALT RUN. It was built in 1939, making it 87 years old today. The structure is built primarily of concrete and spans 1 section, stretching 8.5 meters (28 feet) end to end. Daily traffic averages 2,891 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 22.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How AKRON-PENINSULA RD compares

▼ 15.1
Load rating vs Ohio average (37.5 t)
Bottom 8%
Lower load rating than 92% of Ohio bridges
563
Bridges in Summit · 13 in Poor condition
AKRON-PENINSULA RD 22.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
36.1 / 100 - historical 20–49.9 band
Structural adequacy /55
19.7
Serviceability /30
8.0
Essentiality /15
8.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
22.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1939
Material
Concrete
Number of Spans
1
Structure Length
8.5 m (28 ft)
Deck Width
10.1 m (33 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,891 vehicles/day
Structure Number
7733070

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

AKRON-PENINSULA RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare AKRON-PENINSULA RD against other structures in Summit and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for AKRON-PENINSULA RD?

AKRON-PENINSULA RD in Summit, Ohio has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is AKRON-PENINSULA RD inspected?

AKRON-PENINSULA RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,891 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. AKRON-PENINSULA RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for AKRON-PENINSULA RD?

AKRON-PENINSULA RD has an NBI inventory load rating of 22.4 metric tons.

Who is responsible for maintaining AKRON-PENINSULA RD?

AKRON-PENINSULA RD is owned and maintained by County Highway Agency.

How old is AKRON-PENINSULA RD and does age affect safety?

AKRON-PENINSULA RD was built in 1939, making it 87 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.