FHWA NBI 2024 Inspection record Public-domain dataset

I80 OH TPK

Carrying I80 OH TPK over CSX RR

2.5MI EAST OF EXIT 209, Trumbull, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: I80 OH TPK

The I80 OH TPK bridge in Trumbull, Ohio carries I80 OH TPK over CSX RR. It was built in 1954, making it 72 years old today. It was last reconstructed in 1997, extending its service life. The structure is built primarily of steel continuous and spans 3 sections, stretching 106.4 meters (349 feet) end to end. Daily traffic averages 35,398 vehicles, placing it in the heavily-trafficked tier of Ohio bridges. It is owned and maintained by State Toll Authority.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 29.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I80 OH TPK compares

▼ 8.3
Load rating vs Ohio average (37.5 t)
Bottom 19%
Lower load rating than 81% of Ohio bridges
383
Bridges in Trumbull · 39 in Poor condition
I80 OH TPK 29.2 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
64.1 / 100 - historical 50–79.9 band
Structural adequacy /55
28.1
Serviceability /30
28.0
Essentiality /15
8.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
29.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1954
Last Reconstructed
1997
Material
Steel Continuous
Number of Spans
3
Structure Length
106.4 m (349 ft)
Deck Width
38.3 m (126 ft)
Owner
State Toll Authority
Avg Daily Traffic
35,398 vehicles/day
Structure Number
7829760

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

I80 OH TPK is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare I80 OH TPK against other structures in Trumbull and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I80 OH TPK?

I80 OH TPK in Trumbull, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is I80 OH TPK inspected?

I80 OH TPK's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 35,398 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I80 OH TPK is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I80 OH TPK?

I80 OH TPK has an NBI inventory load rating of 29.2 metric tons.

Who is responsible for maintaining I80 OH TPK?

I80 OH TPK is owned and maintained by State Toll Authority.

How old is I80 OH TPK and does age affect safety?

I80 OH TPK was built in 1954, making it 72 years old and last reconstructed in 1997.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.