FHWA NBI 2024 Inspection record Public-domain dataset

BELMONT ST-NILES

Carrying BELMONT ST-NILES over MAHONING RIVER

N EXT. OF TH63-D HEA, Trumbull, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
62 t Inventory load rating

Bridge Snapshot: BELMONT ST-NILES

The BELMONT ST-NILES bridge in Trumbull, Ohio carries BELMONT ST-NILES over MAHONING RIVER. It was built in 2001, making it 25 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 65.2 meters (214 feet) end to end. Daily traffic averages 3,170 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 9/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 61.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BELMONT ST-NILES compares

▲ 24.1
Load rating vs Ohio average (37.5 t)
Top 7%
Higher load rating than 93% of Ohio bridges
383
Bridges in Trumbull · 39 in Poor condition
BELMONT ST-NILES 61.6 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
78.4 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
14.4
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
9/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
61.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2001
Material
Steel Continuous
Number of Spans
3
Structure Length
65.2 m (214 ft)
Deck Width
7.6 m (25 ft)
Owner
County Highway Agency
Avg Daily Traffic
3,170 vehicles/day
Structure Number
7849923

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates good at 9/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether BELMONT ST-NILES is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BELMONT ST-NILES against other structures in Trumbull and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BELMONT ST-NILES?

BELMONT ST-NILES in Trumbull, Ohio has a deck rating of 6/9, superstructure rating of 9/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BELMONT ST-NILES inspected?

BELMONT ST-NILES's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,170 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BELMONT ST-NILES is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BELMONT ST-NILES?

BELMONT ST-NILES has an NBI inventory load rating of 61.6 metric tons.

Who is responsible for maintaining BELMONT ST-NILES?

BELMONT ST-NILES is owned and maintained by County Highway Agency.

How old is BELMONT ST-NILES and does age affect safety?

BELMONT ST-NILES was built in 2001, making it 25 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.