FHWA NBI 2024 Inspection record Public-domain dataset

FIRST AVE

Carrying FIRST AVE over PIGEON CREEK & BIKE PATH

00.30 S OF DIAMOND AVE, Vanderburgh, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
30 t Inventory load rating

Bridge Snapshot: FIRST AVE

The FIRST AVE bridge in Vanderburgh, Indiana carries FIRST AVE over PIGEON CREEK & BIKE PATH. It was built in 1983, making it 43 years old today. It was last reconstructed in 2010, extending its service life. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 113.7 meters (373 feet) end to end. Daily traffic averages 18,583 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 30.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FIRST AVE compares

▼ 5.6
Load rating vs Indiana average (35.6 t)
Bottom 26%
Lower load rating than 74% of Indiana bridges
286
Bridges in Vanderburgh · 12 in Poor condition
FIRST AVE 30.0 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
79.5 / 100 - historical 50–79.9 band
Structural adequacy /55
53.8
Serviceability /30
14.0
Essentiality /15
11.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
30.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1983
Last Reconstructed
2010
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
113.7 m (373 ft)
Deck Width
19.1 m (63 ft)
Owner
County Highway Agency
Avg Daily Traffic
18,583 vehicles/day
Structure Number
8200099

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether FIRST AVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FIRST AVE against other structures in Vanderburgh and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FIRST AVE?

FIRST AVE in Vanderburgh, Indiana has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FIRST AVE inspected?

FIRST AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 18,583 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FIRST AVE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FIRST AVE?

FIRST AVE has an NBI inventory load rating of 30.0 metric tons.

Who is responsible for maintaining FIRST AVE?

FIRST AVE is owned and maintained by County Highway Agency.

How old is FIRST AVE and does age affect safety?

FIRST AVE was built in 1983, making it 43 years old and last reconstructed in 2010.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.