FHWA NBI 2024 Inspection record Public-domain dataset

USR 250 & SR 83

Carrying USR 250 & SR 83 over U/WAY-250-1218L

OVER SR3 & NEW EB U.S.30, Wayne, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: USR 250 & SR 83

The USR 250 & SR 83 bridge in Wayne, Ohio carries USR 250 & SR 83 over U/WAY-250-1218L. It was built in 1970, making it 56 years old today. The structure is built primarily of steel continuous. Daily traffic averages 23,688 vehicles, placing it in the heavily-trafficked tier of Ohio bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. All reported major components score above the Poor range.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How USR 250 & SR 83 compares

391
Bridges in Wayne · 27 in Poor condition

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
98.9 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Material
Steel Continuous
Avg Daily Traffic
23,688 vehicles/day
Structure Number
8500606

How to read this record

This page shows what the last federal inspection recorded, not whether USR 250 & SR 83 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare USR 250 & SR 83 against other structures in Wayne and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for USR 250 & SR 83?

USR 250 & SR 83 in Wayne, Ohio on the FHWA's 0–9 scale.

How often is USR 250 & SR 83 inspected?

USR 250 & SR 83's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 23,688 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. USR 250 & SR 83 is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for USR 250 & SR 83?

An inventory load rating is not recorded for USR 250 & SR 83.

Who is responsible for maintaining USR 250 & SR 83?

Ownership is not specified for USR 250 & SR 83 in the NBI.

How old is USR 250 & SR 83 and does age affect safety?

USR 250 & SR 83 was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.