FHWA NBI 2024 Inspection record Public-domain dataset

CR 129

Carrying CR 129 over GILMORE CREEK

0.2 mi W of jct TH 61, Winona, Minnesota

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
50 t Inventory load rating

Bridge Snapshot: CR 129

The CR 129 bridge in Winona, Minnesota carries CR 129 over GILMORE CREEK. It was built in 2002, making it 24 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 37.2 meters (122 feet) end to end. Daily traffic averages 1,600 vehicles, placing it in the moderately-trafficked tier of Minnesota bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 50.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 129 compares

▲ 14.3
Load rating vs Minnesota average (35.7 t)
Top 4%
Higher load rating than 96% of Minnesota bridges
221
Bridges in Winona · 9 in Poor condition
CR 129 50.0 t
Minnesota average 35.7 t

Live comparison across Minnesota.

Historical Sufficiency Rating

PlainBridge-computed
99.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
50.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2002
Material
Prestressed Concrete
Number of Spans
3
Structure Length
37.2 m (122 ft)
Deck Width
13.2 m (43 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,600 vehicles/day
Structure Number
85025

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether CR 129 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR 129 against other structures in Winona and across Minnesota. Minnesota bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 129?

CR 129 in Winona, Minnesota has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CR 129 inspected?

CR 129's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,600 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 129 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 129?

CR 129 has an NBI inventory load rating of 50.0 metric tons.

Who is responsible for maintaining CR 129?

CR 129 is owned and maintained by County Highway Agency.

How old is CR 129 and does age affect safety?

CR 129 was built in 2002, making it 24 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.