FHWA NBI 2024 Inspection record Public-domain dataset

PARKVIEW DR

Carrying PARKVIEW DR over THREE ISLAND CANAL

0.1MI E OF 3 ISLAND BLVD., Broward, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
45 t Inventory load rating

Bridge Snapshot: PARKVIEW DR

The PARKVIEW DR bridge in Broward, Florida carries PARKVIEW DR over THREE ISLAND CANAL. It was built in 1978, making it 48 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 49.2 meters (161 feet) end to end. Daily traffic averages 5,200 vehicles, placing it in the moderately-trafficked tier of Florida bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 44.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PARKVIEW DR compares

▲ 5.6
Load rating vs Florida average (38.9 t)
Top 26%
Higher load rating than 74% of Florida bridges
687
Bridges in Broward · 13 in Poor condition
PARKVIEW DR 44.5 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
66.9 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
19.9
Essentiality /15
0.0
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
44.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1978
Material
Prestressed Concrete
Number of Spans
3
Structure Length
49.2 m (161 ft)
Deck Width
21.6 m (71 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
5,200 vehicles/day
Structure Number
866101

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PARKVIEW DR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PARKVIEW DR against other structures in Broward and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PARKVIEW DR?

PARKVIEW DR in Broward, Florida has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PARKVIEW DR inspected?

PARKVIEW DR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PARKVIEW DR is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PARKVIEW DR?

PARKVIEW DR has an NBI inventory load rating of 44.5 metric tons.

Who is responsible for maintaining PARKVIEW DR?

PARKVIEW DR is owned and maintained by City/Municipal Highway Agency.

How old is PARKVIEW DR and does age affect safety?

PARKVIEW DR was built in 1978, making it 48 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.