NEW HARMONY ROAD
Carrying NEW HARMONY ROAD over TRIBUTARY OF SQUAW CREEK
0.42 MI W WEYERBACHER, Warrick, Indiana
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: NEW HARMONY ROAD
The NEW HARMONY ROAD bridge in Warrick, Indiana carries NEW HARMONY ROAD over TRIBUTARY OF SQUAW CREEK. It was built in 1979, making it 47 years old today. The structure is built primarily of steel and spans 2 sections, stretching 9.9 meters (32 feet) end to end. Daily traffic averages 205 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show culvert at 3/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 24.9 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How NEW HARMONY ROAD compares
Live comparison across Indiana.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1979
- Material
- Steel
- Number of Spans
- 2
- Structure Length
- 9.9 m (32 ft)
- Deck Width
- 7.3 m (24 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 205 vehicles/day
- Structure Number
- 8700043
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
NEW HARMONY ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare NEW HARMONY ROAD against other structures in Warrick and across Indiana. Indiana bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for NEW HARMONY ROAD?
NEW HARMONY ROAD in Warrick, Indiana on the FHWA's 0–9 scale.
How often is NEW HARMONY ROAD inspected?
NEW HARMONY ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 205 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. NEW HARMONY ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for NEW HARMONY ROAD?
NEW HARMONY ROAD has an NBI inventory load rating of 24.9 metric tons.
Who is responsible for maintaining NEW HARMONY ROAD?
NEW HARMONY ROAD is owned and maintained by County Highway Agency.
How old is NEW HARMONY ROAD and does age affect safety?
NEW HARMONY ROAD was built in 1979, making it 47 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.