FHWA NBI 2026 Inspection record Public-domain dataset

JUPITER ISLAND PK

Carrying JUPITER ISLAND PK over BRANCH OF ICWW

0.5MI N OF JUPITER BCH RD, Palm Beach, Florida

FHWA NBI inspection record for this structure. Condition ratings, inventory load rating, span, deck width, and average daily traffic refresh annually with each NBI release.

Fair
32 t Inventory load rating

Bridge Snapshot: JUPITER ISLAND PK

The JUPITER ISLAND PK bridge in Palm Beach, Florida carries JUPITER ISLAND PK over BRANCH OF ICWW. It was built in 1995, making it 31 years old today. The structure is built primarily of steel and spans 1 section, stretching 20.5 meters (67 feet) end to end. Daily traffic averages 4 vehicles, placing it in the lower-traffic tier of Florida bridges. It is owned and maintained by County Highway Agency, the entity responsible for routine inspections and any needed repairs.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9 on the 0–9 NBI scale, where 9 is excellent and 0 is failed. The weakest component sits in fair condition, which drives the overall status of this bridge. No major component scores in the poor range, so the bridge is not classified as structurally deficient under federal criteria. Its NBI inventory load rating is 31.6 metric tons — the load level the structure is rated to carry at inventory (long-term) level.

In a county that maintains hundreds of NBI-tracked bridges, JUPITER ISLAND PK is one data point in a Florida inventory that FHWA inspects on a two-year cycle (more often when ratings fall). Bridge age alone is not a reliable safety signal — a 31-era structure can outperform a newer one when maintenance is consistent, materials are sound, and traffic loads stay within design limits. Use the condition ratings above, the sufficiency score, and the structurally-deficient flag together to read the bridge's real status, and check the linked county and state pages to see how this bridge ranks against its peers.

Every figure on this page comes directly from the Federal Highway Administration National Bridge Inventory (NBI), the public dataset that catalogs more than 617,000 highway bridges across the United States and is updated annually from the records that each state Department of Transportation submits to the FHWA. The condition codes use the standardized FHWA Recording and Coding Guide, the same scale that determines federal eligibility for the Highway Bridge Program and the Surface Transportation Block Grant set-aside for off-system bridges. A "structurally deficient" classification under those federal criteria is a maintenance and funding flag, never a closure order; states keep deficient bridges open with load posting, weight limits, or accelerated inspection cycles until rehabilitation or replacement is funded. See our methodology for refresh cadence and the exact NBI release vintage powering each record.

How JUPITER ISLAND PK compares

▼ 7.3
Load rating vs Florida average (38.9 t)
Bottom 30%
Lower load rating than 70% of Florida bridges
610
Bridges in Palm Beach · 2 structurally deficient
JUPITER ISLAND PK 31.6 t
Florida average 38.9 t

NBI inventory load rating (metric tons) and structural-deficiency status compared across Florida, computed live from the FHWA NBI.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
31.6 t
NBI inventory level (metric tons)
SD Status
Not SD

Ratings are on a 0–9 scale: 9 = Excellent, 7–8 = Good, 5–6 = Fair, 3–4 = Poor, 0–2 = Critical/Failed. Sufficiency rating (0–100) combines structural adequacy, functional obsolescence, and essentiality.

Structural Details

Year Built
1995
Material
Steel
Number of Spans
1
Structure Length
20.5 m (67 ft)
Deck Width
4.9 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
4 vehicles/day
Structure Number
934126

Location

0.5MI N OF JUPITER BCH RD, Palm Beach, Florida
26.940236, -80.071983
View on Google Maps ↗

Data Source

Data from the FHWA National Bridge Inventory (NBI). Bridge inspections are required every two years by federal law. Conditions reflect the most recent inspection.

FHWA NBI Program ↗

Condition Analysis

Built in 1995, this bridge is 31 years old. It carries approximately 4 vehicles per day. Based on the most recent FHWA inspection:

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

Its NBI inventory load rating reflects the load level it is rated to carry.

Frequently Asked Questions

What do the condition ratings mean for JUPITER ISLAND PK?

Bridge condition ratings use a 0–9 scale set by the Federal Highway Administration (FHWA). Ratings 7–9 indicate good condition with no significant problems. Ratings 5–6 mean fair condition with minor issues. Ratings 3–4 indicate poor condition requiring repair. Ratings 0–2 are critical, meaning the bridge has serious structural problems. JUPITER ISLAND PK in Palm Beach, Florida has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9.

How often is JUPITER ISLAND PK inspected?

Federal law requires most highway bridges to be inspected at least every 24 months. Bridges in poor condition or with known issues may be inspected more frequently (every 12 months or less). JUPITER ISLAND PK is part of the National Bridge Inventory maintained by the FHWA. With 4 vehicles crossing daily, regular inspection is essential.

What does "structurally deficient" mean for a bridge?

A structurally deficient bridge has at least one major component (deck, superstructure, or substructure) rated 4 or below on the FHWA 0–9 scale. This classification does NOT mean the bridge is unsafe for travel — it means the bridge needs repair, rehabilitation, or eventual replacement. Structurally deficient bridges remain open and are monitored. JUPITER ISLAND PK is not classified as structurally deficient.

What is the inventory load rating for JUPITER ISLAND PK?

The NBI inventory rating is the load level a bridge is rated to carry for an indefinite period, recorded in metric tons. A lower number means the structure is more load-restricted. JUPITER ISLAND PK has an inventory load rating of 31.6 metric tons. It is distinct from the FHWA sufficiency rating, a separate 0–100 funding-eligibility score that this dataset does not include.

Who is responsible for maintaining JUPITER ISLAND PK?

Bridge ownership and maintenance responsibility varies — bridges may be owned by state DOTs, counties, cities, railroads, or federal agencies. JUPITER ISLAND PK is maintained by County Highway Agency. The FHWA oversees the National Bridge Inventory program and sets inspection standards, but day-to-day maintenance falls to the owning agency. If you notice damage or safety concerns, contact your state DOT or call 911 for emergencies.

How old is JUPITER ISLAND PK and does age affect safety?

JUPITER ISLAND PK was built in 1995, making it 31 years old. Bridge age alone does not determine safety — condition depends on materials, design, traffic load, maintenance history, and environmental exposure. Many older bridges remain in good condition due to regular maintenance and reconstruction.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A structurally deficient rating does not mean a bridge is closed or unsafe for travel — it indicates the bridge requires repair or replacement. For current closure or safety information, contact your state DOT.

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial