FHWA NBI 2024 Inspection record Public-domain dataset

US-40 HWY EB

Carrying US-40 HWY EB over RIV,RR,PWRHS RD,PASS, RD

1.45 MI EAST OF 59 S JCT, Douglas, Kansas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
31 t Inventory load rating

Bridge Snapshot: US-40 HWY EB

The US-40 HWY EB bridge in Douglas, Kansas carries US-40 HWY EB over RIV,RR,PWRHS RD,PASS, RD. It was built in 1979, making it 47 years old today. The structure is built primarily of steel continuous and spans 6 sections, stretching 341.0 meters (1119 feet) end to end. Daily traffic averages 7,350 vehicles, placing it in the moderately-trafficked tier of Kansas bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 31.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How US-40 HWY EB compares

▲ 2.0
Load rating vs Kansas average (29.1 t)
Top 44%
Higher load rating than 56% of Kansas bridges
296
Bridges in Douglas · 1 in Poor condition
US-40 HWY EB 31.1 t
Kansas average 29.1 t

Live comparison across Kansas.

Historical Sufficiency Rating

PlainBridge-computed
73.6 / 100 - historical 50–79.9 band
Structural adequacy /55
54.5
Serviceability /30
7.0
Essentiality /15
14.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
31.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Steel Continuous
Number of Spans
6
Structure Length
341.0 m (1119 ft)
Deck Width
11.3 m (37 ft)
Owner
State Highway Agency
Avg Daily Traffic
7,350 vehicles/day
Structure Number
999904000230821

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether US-40 HWY EB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US-40 HWY EB against other structures in Douglas and across Kansas. Kansas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US-40 HWY EB?

US-40 HWY EB in Douglas, Kansas has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is US-40 HWY EB inspected?

US-40 HWY EB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,350 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US-40 HWY EB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US-40 HWY EB?

US-40 HWY EB has an NBI inventory load rating of 31.1 metric tons.

Who is responsible for maintaining US-40 HWY EB?

US-40 HWY EB is owned and maintained by State Highway Agency.

How old is US-40 HWY EB and does age affect safety?

US-40 HWY EB was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.