FHWA NBI 2024 Inspection record Public-domain dataset

RP U54 EB/I135 NB

Carrying RP U54 EB/I135 NB over I135 E&W LANES

JCT I35-US54, Sedgwick, Kansas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: RP U54 EB/I135 NB

The RP U54 EB/I135 NB bridge in Sedgwick, Kansas carries RP U54 EB/I135 NB over I135 E&W LANES. It was built in 1976, making it 50 years old today. The structure is built primarily of concrete continuous. Daily traffic averages 36,057 vehicles, placing it in the heavily-trafficked tier of Kansas bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. All reported major components score above the Poor range.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RP U54 EB/I135 NB compares

1,312
Bridges in Sedgwick · 35 in Poor condition

Live comparison across Kansas.

Historical Sufficiency Rating

PlainBridge-computed
98.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1976
Material
Concrete Continuous
Avg Daily Traffic
36,057 vehicles/day
Structure Number
999913500873041

How to read this record

This page shows what the last federal inspection recorded, not whether RP U54 EB/I135 NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RP U54 EB/I135 NB against other structures in Sedgwick and across Kansas. Kansas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RP U54 EB/I135 NB?

RP U54 EB/I135 NB in Sedgwick, Kansas on the FHWA's 0–9 scale.

How often is RP U54 EB/I135 NB inspected?

RP U54 EB/I135 NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 36,057 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RP U54 EB/I135 NB is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RP U54 EB/I135 NB?

An inventory load rating is not recorded for RP U54 EB/I135 NB.

Who is responsible for maintaining RP U54 EB/I135 NB?

Ownership is not specified for RP U54 EB/I135 NB in the NBI.

How old is RP U54 EB/I135 NB and does age affect safety?

RP U54 EB/I135 NB was built in 1976, making it 50 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.