FHWA NBI 2024 Inspection record Public-domain dataset

WILLIAMSPORT/PILE

Carrying WILLIAMSPORT/PILE over ILIAMNA RIVER

MILE POINT 11.0, Lake and Peninsula, Alaska

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
62 t Inventory load rating Higher than 90% of rated Alaska bridges

WILLIAMSPORT/PILE in Lake and Peninsula, Alaska sits above 90% of rated Alaska bridges on inventory load rating (62 t), while its 2019 build year is earlier than 0% of Lake and Peninsula's recorded-year cohort (10 bridges).

WILLIAMSPORT/PILE in Lake and Peninsula, Alaska is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2019, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure AK:2137

POST-2000 · STEEL · MULTI-SPAN · DECK-LED · TRACE-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • DECK-LED Deck-led
  • TRACE-ADT Trace ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: WILLIAMSPORT/PILE

The WILLIAMSPORT/PILE bridge in Lake and Peninsula, Alaska carries WILLIAMSPORT/PILE over ILIAMNA RIVER. It was built in 2019, making it 7 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 68.0 meters (223 feet) end to end. Daily traffic averages 20 vehicles, placing it in the lower-traffic tier of Alaska bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How WILLIAMSPORT/PILE compares

▲ 24.2
Load rating vs Alaska average (38.2 t; 1,679 of 1,685 rated)
10
Bridges in Lake and Peninsula · 1 in Poor condition

Age against the county: built in 2019, earlier than 0 of Lake and Peninsula's 10 bridges with a recorded construction year (0%), against a county median build year of 1985. This is one of the newer structures in its county.

WILLIAMSPORT/PILE 62.4 t
Alaska average (1,679 of 1,685 rated) 38.2 t

Live comparison across Alaska bridges with a recorded inventory load rating (1,679 of 1,685 rated).

WILLIAMSPORT/PILE vs every rated Alaska bridge

Inventory load rating (metric tons), FHWA NBI, this state

62 Top 10% higher than 90% of 1,679 bridges

rated Alaska bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
62.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Lake and Peninsula inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 10 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2019
Material
Steel Continuous
Number of Spans
2
Structure Length
68.0 m (223 ft)
Deck Width
5.8 m (19 ft)
Owner
State Highway Agency
Avg Daily Traffic
20 vehicles/day
Structure Number
2137

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 9/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 9/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether WILLIAMSPORT/PILE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WILLIAMSPORT/PILE against other structures in Lake and Peninsula and across Alaska. Alaska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WILLIAMSPORT/PILE?

WILLIAMSPORT/PILE in Lake and Peninsula, Alaska has a deck rating of 7/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is WILLIAMSPORT/PILE inspected?

WILLIAMSPORT/PILE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WILLIAMSPORT/PILE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WILLIAMSPORT/PILE?

WILLIAMSPORT/PILE has an NBI inventory load rating of 62.4 metric tons.

Who is responsible for maintaining WILLIAMSPORT/PILE?

WILLIAMSPORT/PILE is owned and maintained by State Highway Agency.

How old is WILLIAMSPORT/PILE and does age affect safety?

WILLIAMSPORT/PILE was built in 2019, making it 7 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.