PT WHITSHED RD EXT
Carrying PT WHITSHED RD EXT over NO NAME CREEK
MILE POINT 6.2, Chugach, Alaska
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
PT WHITSHED RD EXT in Chugach, Alaska sits above 89% of rated Alaska bridges on inventory load rating (61 t), while its 2012 build year is earlier than 9% of Chugach's recorded-year cohort (66 bridges).
PT WHITSHED RD EXT in Chugach, Alaska is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2012, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure AK:2292
POST-2000 · STEEL · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · HEAVY-LOAD · CAT-GOOD
- POST-2000 2000+
- STEEL Steel
- SINGLE-SPAN Single span
- TIED-CTRL Tied control
- LOCAL-ADT Local ADT
- HEAVY-LOAD Heavy load
- CAT-GOOD Good
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: PT WHITSHED RD EXT
The PT WHITSHED RD EXT bridge in Chugach, Alaska carries PT WHITSHED RD EXT over NO NAME CREEK. It was built in 2012, making it 14 years old today. The structure is built primarily of steel and spans 1 section, stretching 30.5 meters (100 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Alaska bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.
How PT WHITSHED RD EXT compares
Age against the county: built in 2012, earlier than 6 of Chugach's 66 bridges with a recorded construction year (9%), against a county median build year of 1977. This is one of the newer structures in its county.
Live comparison across Alaska bridges with a recorded inventory load rating (1,679 of 1,685 rated).
PT WHITSHED RD EXT vs every rated Alaska bridge
Inventory load rating (metric tons), FHWA NBI, this state
61 Top 11% higher than 89% of 1,679 bridges
rated Alaska bridges, bucketed by value
Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source FHWA National Bridge Inventory · August 2026
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.
Chugach inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 66 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 2012
- Material
- Steel
- Number of Spans
- 1
- Structure Length
- 30.5 m (100 ft)
- Deck Width
- 10.1 m (33 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 50 vehicles/day
- Structure Number
- 2292
Condition Analysis
- • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
- • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
- • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether PT WHITSHED RD EXT is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare PT WHITSHED RD EXT against other structures in Chugach and across Alaska. Alaska bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for PT WHITSHED RD EXT?
PT WHITSHED RD EXT in Chugach, Alaska has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.
How often is PT WHITSHED RD EXT inspected?
PT WHITSHED RD EXT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. PT WHITSHED RD EXT is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for PT WHITSHED RD EXT?
PT WHITSHED RD EXT has an NBI inventory load rating of 60.6 metric tons.
Who is responsible for maintaining PT WHITSHED RD EXT?
PT WHITSHED RD EXT is owned and maintained by City/Municipal Highway Agency.
How old is PT WHITSHED RD EXT and does age affect safety?
PT WHITSHED RD EXT was built in 2012, making it 14 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.