FHWA NBI 2024 Inspection record Public-domain dataset

AL 205

Carrying AL 205 over ATN RR

AL 205 * ATN RR, Etowah, Alabama

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
52 t Inventory load rating Higher than 84% of rated Alabama bridges

AL 205 in Etowah, Alabama sits above 84% of rated Alabama bridges on inventory load rating (52 t), while its 1924 build year is earlier than 99% of Etowah's recorded-year cohort (236 bridges).

AL 205 in Etowah, Alabama is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1924, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure AL:000438

PRE-1950 · CONCRETE · MULTI-SPAN · SUPER-LED · ARTERIAL-ADT · HEAVY-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • SUPER-LED Superstructure-led
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: AL 205

The AL 205 bridge in Etowah, Alabama carries AL 205 over ATN RR. It was built in 1924, making it 102 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 28.0 meters (92 feet) end to end. Daily traffic averages 1,410 vehicles, placing it in the moderately-trafficked tier of Alabama bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How AL 205 compares

▲ 14.3
Load rating vs Alabama average (37.6 t; 16,191 of 16,205 rated)
236
Bridges in Etowah · 5 in Poor condition

Age against the county: built in 1924, earlier than 233 of Etowah's 236 bridges with a recorded construction year (99%), against a county median build year of 1974. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

AL 205 51.9 t
Alabama average (16,191 of 16,205 rated) 37.6 t

Live comparison across Alabama bridges with a recorded inventory load rating (16,191 of 16,205 rated).

AL 205 vs every rated Alabama bridge

Inventory load rating (metric tons), FHWA NBI, this state

52 Top 16% higher than 84% of 16,191 bridges

rated Alabama bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
51.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Etowah inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 236 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1924
Material
Concrete
Number of Spans
3
Structure Length
28.0 m (92 ft)
Deck Width
5.8 m (19 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,410 vehicles/day
Structure Number
000438

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

AL 205 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare AL 205 against other structures in Etowah and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for AL 205?

AL 205 in Etowah, Alabama has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is AL 205 inspected?

AL 205's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,410 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. AL 205 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for AL 205?

AL 205 has an NBI inventory load rating of 51.9 metric tons.

Who is responsible for maintaining AL 205?

AL 205 is owned and maintained by State Highway Agency.

How old is AL 205 and does age affect safety?

AL 205 was built in 1924, making it 102 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.