FHWA NBI 2024 Inspection record Public-domain dataset

NEW CUT ROAD

Carrying NEW CUT ROAD over CROWDABOUT CREEK

2.0 MI SOUTH SR 36, Morgan, Alabama

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
56 t Inventory load rating Higher than 87% of rated Alabama bridges

NEW CUT ROAD in Morgan, Alabama sits above 87% of rated Alabama bridges on inventory load rating (56 t), while its 2003 build year is earlier than 19% of Morgan's recorded-year cohort (271 bridges).

NEW CUT ROAD in Morgan, Alabama is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2003, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure AL:018797

POST-2000 · CONCRETE · LONG-SPAN-RUN · TIED-CTRL · LOCAL-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • CONCRETE Concrete
  • LONG-SPAN-RUN 5 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: NEW CUT ROAD

The NEW CUT ROAD bridge in Morgan, Alabama carries NEW CUT ROAD over CROWDABOUT CREEK. It was built in 2003, making it 23 years old today. The structure is built primarily of concrete and spans 5 sections, stretching 61.0 meters (200 feet) end to end. Daily traffic averages 580 vehicles, placing it in the lower-traffic tier of Alabama bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How NEW CUT ROAD compares

▲ 18.0
Load rating vs Alabama average (37.6 t; 16,191 of 16,205 rated)
271
Bridges in Morgan · 4 in Poor condition

Age against the county: built in 2003, earlier than 52 of Morgan's 271 bridges with a recorded construction year (19%), against a county median build year of 1973. This is one of the newer structures in its county.

NEW CUT ROAD 55.6 t
Alabama average (16,191 of 16,205 rated) 37.6 t

Live comparison across Alabama bridges with a recorded inventory load rating (16,191 of 16,205 rated).

NEW CUT ROAD vs every rated Alabama bridge

Inventory load rating (metric tons), FHWA NBI, this state

56 Top 13% higher than 87% of 16,191 bridges

rated Alabama bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
55.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Morgan inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 271 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2003
Material
Concrete
Number of Spans
5
Structure Length
61.0 m (200 ft)
Deck Width
8.8 m (29 ft)
Owner
County Highway Agency
Avg Daily Traffic
580 vehicles/day
Structure Number
018797

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether NEW CUT ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NEW CUT ROAD against other structures in Morgan and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NEW CUT ROAD?

NEW CUT ROAD in Morgan, Alabama has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is NEW CUT ROAD inspected?

NEW CUT ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 580 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NEW CUT ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NEW CUT ROAD?

NEW CUT ROAD has an NBI inventory load rating of 55.6 metric tons.

Who is responsible for maintaining NEW CUT ROAD?

NEW CUT ROAD is owned and maintained by County Highway Agency.

How old is NEW CUT ROAD and does age affect safety?

NEW CUT ROAD was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.