FHWA NBI 2024 Inspection record Public-domain dataset

JAMES MADISON ROAD

Carrying JAMES MADISON ROAD over BRADFORD CREEK

.50 MILE WEST OF WALL TRI, Madison, Alabama

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
2 t Inventory load rating Lower than 99% of rated Alabama bridges

JAMES MADISON ROAD in Madison, Alabama sits above 1% of rated Alabama bridges on inventory load rating (2 t), while its 1936 build year is earlier than 94% of Madison's recorded-year cohort (710 bridges).

JAMES MADISON ROAD in Madison, Alabama is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1936, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure AL:019202

PRE-1950 · CONCRETE · MULTI-SPAN · DECK-LED · LOCAL-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • MULTI-SPAN 2 spans
  • DECK-LED Deck-led
  • LOCAL-ADT Local ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: JAMES MADISON ROAD

The JAMES MADISON ROAD bridge in Madison, Alabama carries JAMES MADISON ROAD over BRADFORD CREEK. It was built in 1936, making it 90 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 23.5 meters (77 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Alabama bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How JAMES MADISON ROAD compares

▼ 35.8
Load rating vs Alabama average (37.6 t; 16,191 of 16,205 rated)
710
Bridges in Madison · 9 in Poor condition

Age against the county: built in 1936, earlier than 664 of Madison's 710 bridges with a recorded construction year (94%), against a county median build year of 1970. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

JAMES MADISON ROAD 1.8 t
Alabama average (16,191 of 16,205 rated) 37.6 t

Live comparison across Alabama bridges with a recorded inventory load rating (16,191 of 16,205 rated).

JAMES MADISON ROAD vs every rated Alabama bridge

Inventory load rating (metric tons), FHWA NBI, this state

2 Top 99% higher than 1% of 16,191 bridges

rated Alabama bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
1.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Madison inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 710 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1936
Material
Concrete
Number of Spans
2
Structure Length
23.5 m (77 ft)
Deck Width
7.0 m (23 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
50 vehicles/day
Structure Number
019202

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

JAMES MADISON ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare JAMES MADISON ROAD against other structures in Madison and across Alabama. Alabama bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for JAMES MADISON ROAD?

JAMES MADISON ROAD in Madison, Alabama has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is JAMES MADISON ROAD inspected?

JAMES MADISON ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. JAMES MADISON ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for JAMES MADISON ROAD?

JAMES MADISON ROAD has an NBI inventory load rating of 1.8 metric tons.

Who is responsible for maintaining JAMES MADISON ROAD?

JAMES MADISON ROAD is owned and maintained by City/Municipal Highway Agency.

How old is JAMES MADISON ROAD and does age affect safety?

JAMES MADISON ROAD was built in 1936, making it 90 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.