FHWA NBI 2024 Inspection record Public-domain dataset

STH 48

Carrying STH 48 over RED CEDAR RIVER

3.4M E JCT CTH NN, Barron, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
34 t Inventory load rating

Bridge Snapshot: STH 48

The STH 48 bridge in Barron, Wisconsin carries STH 48 over RED CEDAR RIVER. It was built in 1987, making it 39 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 18.5 meters (61 feet) end to end. Daily traffic averages 2,000 vehicles, placing it in the moderately-trafficked tier of Wisconsin bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 7/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 34.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How STH 48 compares

▲ 0.7
Load rating vs Wisconsin average (33.3 t)
Bottom 47%
Lower load rating than 53% of Wisconsin bridges
321
Bridges in Barron · 17 in Poor condition
STH 48 34.0 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
66.7 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
27.0
Essentiality /15
9.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
7/9
Good (7–9)
Inventory Load Rating
34.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Prestressed Concrete
Number of Spans
1
Structure Length
18.5 m (61 ft)
Deck Width
11.3 m (37 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,000 vehicles/day
Structure Number
B03009600000000

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

STH 48 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare STH 48 against other structures in Barron and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for STH 48?

STH 48 in Barron, Wisconsin has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is STH 48 inspected?

STH 48's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. STH 48 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for STH 48?

STH 48 has an NBI inventory load rating of 34.0 metric tons.

Who is responsible for maintaining STH 48?

STH 48 is owned and maintained by State Highway Agency.

How old is STH 48 and does age affect safety?

STH 48 was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.