FHWA NBI 2024 Inspection record Public-domain dataset

HWY BARDWELL ST

Carrying HWY BARDWELL ST over WATER JABISH BROOK

0.5M W OF RT181 NEAR PLMR, Hampshire, Massachusetts

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
19 t Inventory load rating

Bridge Snapshot: HWY BARDWELL ST

The HWY BARDWELL ST bridge in Hampshire, Massachusetts carries HWY BARDWELL ST over WATER JABISH BROOK. It was built in 1940, making it 86 years old today. The structure is built primarily of steel and spans 1 section, stretching 12.5 meters (41 feet) end to end. Daily traffic averages 1,164 vehicles, placing it in the moderately-trafficked tier of Massachusetts bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 19.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY BARDWELL ST compares

▼ 21.9
Load rating vs Massachusetts average (41.2 t)
Bottom 5%
Lower load rating than 95% of Massachusetts bridges
259
Bridges in Hampshire · 23 in Poor condition
HWY BARDWELL ST 19.3 t
Massachusetts average 41.2 t

Live comparison across Massachusetts.

Historical Sufficiency Rating

PlainBridge-computed
37.0 / 100 - historical 20–49.9 band
Structural adequacy /55
14.6
Serviceability /30
8.0
Essentiality /15
14.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
19.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1940
Material
Steel
Number of Spans
1
Structure Length
12.5 m (41 ft)
Deck Width
5.5 m (18 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
1,164 vehicles/day
Structure Number
B050060PEMUNNBI

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

HWY BARDWELL ST is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HWY BARDWELL ST against other structures in Hampshire and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY BARDWELL ST?

HWY BARDWELL ST in Hampshire, Massachusetts has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is HWY BARDWELL ST inspected?

HWY BARDWELL ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,164 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY BARDWELL ST is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY BARDWELL ST?

HWY BARDWELL ST has an NBI inventory load rating of 19.3 metric tons.

Who is responsible for maintaining HWY BARDWELL ST?

HWY BARDWELL ST is owned and maintained by Town/Township Highway Agency.

How old is HWY BARDWELL ST and does age affect safety?

HWY BARDWELL ST was built in 1940, making it 86 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.