FHWA NBI 2024 Inspection record Public-domain dataset

IH I41 SB OFF RAMP

Carrying IH I41 SB OFF RAMP over ASHWAUBENON CREEK

USH 41 TO CTH F, Brown, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
34 t Inventory load rating

Bridge Snapshot: IH I41 SB OFF RAMP

The IH I41 SB OFF RAMP bridge in Brown, Wisconsin carries IH I41 SB OFF RAMP over ASHWAUBENON CREEK. It was built in 2011, making it 15 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 26.9 meters (88 feet) end to end. Daily traffic averages 3,700 vehicles, placing it in the moderately-trafficked tier of Wisconsin bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 34.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IH I41 SB OFF RAMP compares

▲ 0.7
Load rating vs Wisconsin average (33.3 t)
Bottom 47%
Lower load rating than 53% of Wisconsin bridges
478
Bridges in Brown · 18 in Poor condition
IH I41 SB OFF RAMP 34.0 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
99.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
34.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2011
Material
Prestressed Concrete
Number of Spans
1
Structure Length
26.9 m (88 ft)
Deck Width
11.7 m (38 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,700 vehicles/day
Structure Number
B05060300000000

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether IH I41 SB OFF RAMP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IH I41 SB OFF RAMP against other structures in Brown and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IH I41 SB OFF RAMP?

IH I41 SB OFF RAMP in Brown, Wisconsin has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is IH I41 SB OFF RAMP inspected?

IH I41 SB OFF RAMP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IH I41 SB OFF RAMP is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IH I41 SB OFF RAMP?

IH I41 SB OFF RAMP has an NBI inventory load rating of 34.0 metric tons.

Who is responsible for maintaining IH I41 SB OFF RAMP?

IH I41 SB OFF RAMP is owned and maintained by State Highway Agency.

How old is IH I41 SB OFF RAMP and does age affect safety?

IH I41 SB OFF RAMP was built in 2011, making it 15 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.