FHWA NBI 2024 Inspection record Public-domain dataset

LRD OAK VALLEY RD

Carrying LRD OAK VALLEY RD over BR WAUMANDEE CREEK

1.5M E JCT STH 88, Buffalo, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
27 t Inventory load rating

Bridge Snapshot: LRD OAK VALLEY RD

The LRD OAK VALLEY RD bridge in Buffalo, Wisconsin carries LRD OAK VALLEY RD over BR WAUMANDEE CREEK. It was built in 2009, making it 17 years old today. The structure is built primarily of concrete and spans 1 section, stretching 12.4 meters (41 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Wisconsin bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 26.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LRD OAK VALLEY RD compares

▼ 6.7
Load rating vs Wisconsin average (33.3 t)
Bottom 22%
Lower load rating than 78% of Wisconsin bridges
239
Bridges in Buffalo · 20 in Poor condition
LRD OAK VALLEY RD 26.6 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
95.5 / 100 - historical 80–100 band
Structural adequacy /55
50.5
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
26.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2009
Material
Concrete
Number of Spans
1
Structure Length
12.4 m (41 ft)
Deck Width
8.1 m (27 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
10 vehicles/day
Structure Number
B06016600000000

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether LRD OAK VALLEY RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LRD OAK VALLEY RD against other structures in Buffalo and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LRD OAK VALLEY RD?

LRD OAK VALLEY RD in Buffalo, Wisconsin has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is LRD OAK VALLEY RD inspected?

LRD OAK VALLEY RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LRD OAK VALLEY RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LRD OAK VALLEY RD?

LRD OAK VALLEY RD has an NBI inventory load rating of 26.6 metric tons.

Who is responsible for maintaining LRD OAK VALLEY RD?

LRD OAK VALLEY RD is owned and maintained by Town/Township Highway Agency.

How old is LRD OAK VALLEY RD and does age affect safety?

LRD OAK VALLEY RD was built in 2009, making it 17 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.