LRD SEYMOUR CRAY S
Carrying LRD SEYMOUR CRAY S over STH 29
TOWN OF HALLIE, Chippewa, Wisconsin
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: LRD SEYMOUR CRAY S
The LRD SEYMOUR CRAY S bridge in Chippewa, Wisconsin carries LRD SEYMOUR CRAY S over STH 29. It was built in 2000, making it 26 years old today. The structure is built primarily of prestressed concrete. Daily traffic averages 20,000 vehicles, placing it in the heavily-trafficked tier of Wisconsin bridges.
The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. None of this bridge's reported major components fall into the Poor condition range.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How LRD SEYMOUR CRAY S compares
Live comparison across Wisconsin.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 2000
- Material
- Prestressed Concrete
- Avg Daily Traffic
- 20,000 vehicles/day
- Structure Number
- B09022300000000
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether LRD SEYMOUR CRAY S is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare LRD SEYMOUR CRAY S against other structures in Chippewa and across Wisconsin. Wisconsin bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for LRD SEYMOUR CRAY S?
LRD SEYMOUR CRAY S in Chippewa, Wisconsin on the FHWA's 0–9 scale.
How often is LRD SEYMOUR CRAY S inspected?
LRD SEYMOUR CRAY S's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 20,000 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. LRD SEYMOUR CRAY S is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for LRD SEYMOUR CRAY S?
An inventory load rating is not recorded for LRD SEYMOUR CRAY S.
Who is responsible for maintaining LRD SEYMOUR CRAY S?
Ownership is not specified for LRD SEYMOUR CRAY S in the NBI.
How old is LRD SEYMOUR CRAY S and does age affect safety?
LRD SEYMOUR CRAY S was built in 2000, making it 26 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.