FHWA NBI 2024 Inspection record Public-domain dataset

GREEN VALLEY PW

Carrying GREEN VALLEY PW over PITTMAN WASH

HENDERSON, Clark, Nevada

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
49 t Inventory load rating

Bridge Snapshot: GREEN VALLEY PW

The GREEN VALLEY PW bridge in Clark, Nevada carries GREEN VALLEY PW over PITTMAN WASH. It was built in 1990, making it 36 years old today. The structure is built primarily of concrete continuous and spans 4 sections, stretching 36.8 meters (121 feet) end to end. Daily traffic averages 21,500 vehicles, placing it in the heavily-trafficked tier of Nevada bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 49.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GREEN VALLEY PW compares

▲ 2.4
Load rating vs Nevada average (46.6 t)
Top 33%
Higher load rating than 67% of Nevada bridges
1,175
Bridges in Clark · 2 in Poor condition
GREEN VALLEY PW 49.0 t
Nevada average 46.6 t

Live comparison across Nevada.

Historical Sufficiency Rating

PlainBridge-computed
79.7 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
13.7
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
49.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1990
Material
Concrete Continuous
Number of Spans
4
Structure Length
36.8 m (121 ft)
Deck Width
30.5 m (100 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
21,500 vehicles/day
Structure Number
B2096

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether GREEN VALLEY PW is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare GREEN VALLEY PW against other structures in Clark and across Nevada. Nevada bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GREEN VALLEY PW?

GREEN VALLEY PW in Clark, Nevada has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is GREEN VALLEY PW inspected?

GREEN VALLEY PW's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 21,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GREEN VALLEY PW is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GREEN VALLEY PW?

GREEN VALLEY PW has an NBI inventory load rating of 49.0 metric tons.

Who is responsible for maintaining GREEN VALLEY PW?

GREEN VALLEY PW is owned and maintained by City/Municipal Highway Agency.

How old is GREEN VALLEY PW and does age affect safety?

GREEN VALLEY PW was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.