FHWA NBI 2024 Inspection record Public-domain dataset

CTH U (BEETOWN SC

Carrying CTH U (BEETOWN SC over BEETOWN BRANCH

0.3M N JCT STH 81, Grant, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
36 t Inventory load rating

Bridge Snapshot: CTH U (BEETOWN SC

The CTH U (BEETOWN SC bridge in Grant, Wisconsin carries CTH U (BEETOWN SC over BEETOWN BRANCH. It was built in 2003, making it 23 years old today. The structure is built primarily of concrete and spans 1 section, stretching 13.1 meters (43 feet) end to end. Daily traffic averages 740 vehicles, placing it in the lower-traffic tier of Wisconsin bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 35.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CTH U (BEETOWN SC compares

▲ 2.3
Load rating vs Wisconsin average (33.3 t)
Top 45%
Higher load rating than 55% of Wisconsin bridges
385
Bridges in Grant · 17 in Poor condition
CTH U (BEETOWN SC 35.6 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
94.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
35.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2003
Material
Concrete
Number of Spans
1
Structure Length
13.1 m (43 ft)
Deck Width
9.7 m (32 ft)
Owner
County Highway Agency
Avg Daily Traffic
740 vehicles/day
Structure Number
B22021600000000

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether CTH U (BEETOWN SC is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CTH U (BEETOWN SC against other structures in Grant and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CTH U (BEETOWN SC?

CTH U (BEETOWN SC in Grant, Wisconsin has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CTH U (BEETOWN SC inspected?

CTH U (BEETOWN SC's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 740 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CTH U (BEETOWN SC is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CTH U (BEETOWN SC?

CTH U (BEETOWN SC has an NBI inventory load rating of 35.6 metric tons.

Who is responsible for maintaining CTH U (BEETOWN SC?

CTH U (BEETOWN SC is owned and maintained by County Highway Agency.

How old is CTH U (BEETOWN SC and does age affect safety?

CTH U (BEETOWN SC was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.