FHWA NBI 2024 Inspection record Public-domain dataset

USH 10/WALDO BLVD

Carrying USH 10/WALDO BLVD over LITTLE MANITOWOC RIVER

0.2M W JCT USH 10 TO N, Manitowoc, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
45 t Inventory load rating

Bridge Snapshot: USH 10/WALDO BLVD

The USH 10/WALDO BLVD bridge in Manitowoc, Wisconsin carries USH 10/WALDO BLVD over LITTLE MANITOWOC RIVER. It was built in 1934, making it 92 years old today. The structure is built primarily of concrete and spans 1 section, stretching 10.1 meters (33 feet) end to end. Daily traffic averages 13,800 vehicles, placing it in the heavily-trafficked tier of Wisconsin bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 45.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How USH 10/WALDO BLVD compares

▲ 12.1
Load rating vs Wisconsin average (33.3 t)
Top 6%
Higher load rating than 94% of Wisconsin bridges
272
Bridges in Manitowoc · 10 in Poor condition
USH 10/WALDO BLVD 45.4 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
67.1 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
11.0
Essentiality /15
11.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
45.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1934
Material
Concrete
Number of Spans
1
Structure Length
10.1 m (33 ft)
Deck Width
31.7 m (104 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
13,800 vehicles/day
Structure Number
B36090000000000

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether USH 10/WALDO BLVD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare USH 10/WALDO BLVD against other structures in Manitowoc and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for USH 10/WALDO BLVD?

USH 10/WALDO BLVD in Manitowoc, Wisconsin has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is USH 10/WALDO BLVD inspected?

USH 10/WALDO BLVD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. USH 10/WALDO BLVD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for USH 10/WALDO BLVD?

USH 10/WALDO BLVD has an NBI inventory load rating of 45.4 metric tons.

Who is responsible for maintaining USH 10/WALDO BLVD?

USH 10/WALDO BLVD is owned and maintained by City/Municipal Highway Agency.

How old is USH 10/WALDO BLVD and does age affect safety?

USH 10/WALDO BLVD was built in 1934, making it 92 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.