FHWA NBI 2024 Inspection record Public-domain dataset

LRD STETTIN DRIVE

Carrying LRD STETTIN DRIVE over LITTLE RIB RIVER

2.3M W JCT STH 52, Marathon, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
39 t Inventory load rating

Bridge Snapshot: LRD STETTIN DRIVE

The LRD STETTIN DRIVE bridge in Marathon, Wisconsin carries LRD STETTIN DRIVE over LITTLE RIB RIVER. It was built in 1985, making it 41 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 38.3 meters (126 feet) end to end. Daily traffic averages 1,100 vehicles, placing it in the moderately-trafficked tier of Wisconsin bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 38.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LRD STETTIN DRIVE compares

▲ 5.6
Load rating vs Wisconsin average (33.3 t)
Top 26%
Higher load rating than 74% of Wisconsin bridges
534
Bridges in Marathon · 54 in Poor condition
LRD STETTIN DRIVE 38.9 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
56.8 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
14.6
Essentiality /15
14.2
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
38.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Concrete Continuous
Number of Spans
3
Structure Length
38.3 m (126 ft)
Deck Width
9.7 m (32 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
1,100 vehicles/day
Structure Number
B37019700000000

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

LRD STETTIN DRIVE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare LRD STETTIN DRIVE against other structures in Marathon and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LRD STETTIN DRIVE?

LRD STETTIN DRIVE in Marathon, Wisconsin has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is LRD STETTIN DRIVE inspected?

LRD STETTIN DRIVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LRD STETTIN DRIVE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LRD STETTIN DRIVE?

LRD STETTIN DRIVE has an NBI inventory load rating of 38.9 metric tons.

Who is responsible for maintaining LRD STETTIN DRIVE?

LRD STETTIN DRIVE is owned and maintained by Town/Township Highway Agency.

How old is LRD STETTIN DRIVE and does age affect safety?

LRD STETTIN DRIVE was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.