FHWA NBI 2024 Inspection record Public-domain dataset

LRD E CHURCH ST

Carrying LRD E CHURCH ST over ALLEN CREEK

0.1M E JCT STH 59, Rock, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
34 t Inventory load rating

Bridge Snapshot: LRD E CHURCH ST

The LRD E CHURCH ST bridge in Rock, Wisconsin carries LRD E CHURCH ST over ALLEN CREEK. It was built in 1983, making it 43 years old today. The structure is built primarily of concrete and spans 1 section, stretching 11.3 meters (37 feet) end to end. Daily traffic averages 243 vehicles, placing it in the lower-traffic tier of Wisconsin bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 34.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How LRD E CHURCH ST compares

▲ 0.7
Load rating vs Wisconsin average (33.3 t)
Bottom 47%
Lower load rating than 53% of Wisconsin bridges
325
Bridges in Rock · 11 in Poor condition
LRD E CHURCH ST 34.0 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
100.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
34.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1983
Material
Concrete
Number of Spans
1
Structure Length
11.3 m (37 ft)
Deck Width
12.2 m (40 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
243 vehicles/day
Structure Number
B53012800000000

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether LRD E CHURCH ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LRD E CHURCH ST against other structures in Rock and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LRD E CHURCH ST?

LRD E CHURCH ST in Rock, Wisconsin has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is LRD E CHURCH ST inspected?

LRD E CHURCH ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 243 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LRD E CHURCH ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LRD E CHURCH ST?

LRD E CHURCH ST has an NBI inventory load rating of 34.0 metric tons.

Who is responsible for maintaining LRD E CHURCH ST?

LRD E CHURCH ST is owned and maintained by City/Municipal Highway Agency.

How old is LRD E CHURCH ST and does age affect safety?

LRD E CHURCH ST was built in 1983, making it 43 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.