FHWA NBI 2024 Inspection record Public-domain dataset

IH 39 NB

Carrying IH 39 NB over ROCK RIVER

0.3 MI W JCT STH 59, Rock, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Unknown

Bridge Snapshot: IH 39 NB

The IH 39 NB bridge in Rock, Wisconsin carries IH 39 NB over ROCK RIVER. It was built in 2016, making it 10 years old today. The structure is built primarily of prestressed concrete continuous. Daily traffic averages 1,750 vehicles, placing it in the moderately-trafficked tier of Wisconsin bridges.

The latest FHWA inspection records show limited component ratings on file. The weakest component sits in unrated condition. No reported major component scores in the Poor range under the current federal condition thresholds.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IH 39 NB compares

325
Bridges in Rock · 11 in Poor condition

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
75.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
7.0
Essentiality /15
13.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Overall Condition
Unrated

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2016
Material
Prestressed Concrete Continuous
Avg Daily Traffic
1,750 vehicles/day
Structure Number
B53035800000000

How to read this record

This page shows what the last federal inspection recorded, not whether IH 39 NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IH 39 NB against other structures in Rock and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IH 39 NB?

IH 39 NB in Rock, Wisconsin on the FHWA's 0–9 scale.

How often is IH 39 NB inspected?

IH 39 NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,750 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IH 39 NB is currently shown as unrated condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IH 39 NB?

An inventory load rating is not recorded for IH 39 NB.

Who is responsible for maintaining IH 39 NB?

Ownership is not specified for IH 39 NB in the NBI.

How old is IH 39 NB and does age affect safety?

IH 39 NB was built in 2016, making it 10 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.