FHWA NBI 2024 Inspection record Public-domain dataset

IH I-41/USH 41/USH

Carrying IH I-41/USH 41/USH over WISC & SOUTHERN RR

6.8 MI N JCT STH 74 TO E, Washington, Wisconsin

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: IH I-41/USH 41/USH

The IH I-41/USH 41/USH bridge in Washington, Wisconsin carries IH I-41/USH 41/USH over WISC & SOUTHERN RR. It was built in 1952, making it 74 years old today. It was last reconstructed in 1970, extending its service life. The structure is built primarily of steel continuous and spans 3 sections, stretching 53.2 meters (175 feet) end to end. Daily traffic averages 35,400 vehicles, placing it in the heavily-trafficked tier of Wisconsin bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 25.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IH I-41/USH 41/USH compares

▼ 7.4
Load rating vs Wisconsin average (33.3 t)
Bottom 19%
Lower load rating than 81% of Wisconsin bridges
166
Bridges in Washington · 13 in Poor condition
IH I-41/USH 41/USH 25.9 t
Wisconsin average 33.3 t

Live comparison across Wisconsin.

Historical Sufficiency Rating

PlainBridge-computed
90.8 / 100 - historical 80–100 band
Structural adequacy /55
49.6
Serviceability /30
30.0
Essentiality /15
11.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1952
Last Reconstructed
1970
Material
Steel Continuous
Number of Spans
3
Structure Length
53.2 m (175 ft)
Deck Width
21.0 m (69 ft)
Owner
State Highway Agency
Avg Daily Traffic
35,400 vehicles/day
Structure Number
B66000100000000

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether IH I-41/USH 41/USH is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IH I-41/USH 41/USH against other structures in Washington and across Wisconsin. Wisconsin bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IH I-41/USH 41/USH?

IH I-41/USH 41/USH in Washington, Wisconsin has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is IH I-41/USH 41/USH inspected?

IH I-41/USH 41/USH's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 35,400 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IH I-41/USH 41/USH is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IH I-41/USH 41/USH?

IH I-41/USH 41/USH has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining IH I-41/USH 41/USH?

IH I-41/USH 41/USH is owned and maintained by State Highway Agency.

How old is IH I-41/USH 41/USH and does age affect safety?

IH I-41/USH 41/USH was built in 1952, making it 74 years old and last reconstructed in 1970.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.